 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑 7 K) A6 b. g+ m8 N( |9 o
7 C4 a/ `6 a* U3 @2 @. Z
Journeyman Electrician: p/ h& T6 N4 ?6 a8 |6 |! [
Total Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-20 O) G% P h7 n" k5 D) l; I m) H' @$ C
Contractor: Norcan Electric+ Q( c( v( t6 K+ e* e' c
Location: Syncrude Maintenace (Base Plant)
, z" ]! q+ a8 w/ hDescription:
' P! X# a+ V9 ^" x! \8 rDay shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.' _' M# H. G/ c9 K
Pre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.
* E7 q( ?3 m/ QOpen Date: 07/22/2015
, a5 L$ c! l/ Y. _: u2 [$ q; L+ KClose Date: 08/31/2015& D) K8 T# I. v6 F& {1 C
Job #: 441 |
|