 鲜花( 30)  鸡蛋( 0)
|
本帖最后由 爱城一粒沙子 于 2015-7-29 16:33 编辑
, S4 H! [3 S- p/ I+ [' n, N# ]. M0 M) D; [$ a1 }6 F2 Y
Journeyman Electrician
. W% \* @0 h4 Y% g' Y9 p. MTotal Number of Positions: 20 Positions Filled: 16 High Number: 103939 TRAVELER-2, M* w9 |' S8 K7 T
Contractor: Norcan Electric+ j5 K2 `: X. e# b) x8 s3 f/ t
Location: Syncrude Maintenace (Base Plant)$ J8 K v/ L& f; o* p4 z
Description:
V; \! [4 F4 l( y- k! W2 s1 ?/ ADay shift, Start ASAP, 1 Week plus, 4/10's (May change to 10/4), Report after callout, Orientation to be confirmed, Working under the Maintenance Agreement, No beards, Own transportation, Camp provided if no residents, Industrial rate.4 P1 D1 d: Q) z; N/ E6 F4 P
Pre-Requisites / Conditions: Pre-Access D&A (Active RSAP Site), CSTS, Heavy Lifting, Bending, Pulling, Climbing, Working at Heights, Must Have 2 Way Radio Communication Experience, Confined Space/Fall Protection/Mask Fit/H2S Alive/ First Aid/AWP & EHT Experience Preferred.
6 e% l. S, s+ u) ~. ]" I* G& kOpen Date: 07/22/2015# _$ X& X; a, C& s
Close Date: 08/31/2015* i- j$ {1 z# C4 c* |+ [- U0 w
Job #: 441 |
|