米乐 发表于 2014-6-24 22:12 1 ~4 h- d, c! L2 }# U
一共就两次walk through,第一次就说了railing有问题, 然后就是最后一次walk through,发现完全没看图纸 ...
) b- L8 R3 c. D/ X6 l+ ADid you ever follow up with the builder?5 n- J! _" _6 \& }
I would tell the site superintendent to arrange another walk through once the problem is fixed but not drag it along until the final walk through.( o; [3 g! L2 j, l8 u) r# S
It is too late to talk about this now.
# G% O. { W r, G3 ?If you have everything documented, show it to the lawyer and ask for hold back.9 G/ {1 X1 I' f! ^! G7 T
D, B3 l3 x. H, I
If you can live with the wall, ask the builder to compensate you instead of removing the wall.( x9 c9 h$ P8 v2 U5 E/ c) o' \
It will be messy after you move in and they come back to take down the wall. |
|