A 6.5 inch dia shaft is to be machined on a TURNING CTR to 4.5 inch dia in 4 equal cuts. If CONSTANT CS is selected calculate the RPM at the beginning of each cut. z' W6 b+ t: M; r: }1 u, p0 B; DNOTE: CS=1000 ft/min for carbide insert used. 0 ]& ^ |/ C. r" a- I' C; c$ G, R& F. `+ k3 r
so RPM(1)= * l, Y5 a& P. X+ i) J, ]6 j' k RPM(2)=2 A2 w# A3 N/ j- @1 [ L
RPM(3)=$ {- h2 M' @3 q% d
RPM(4)= 3 Z. _- d/ H) U) L6 N8 F8 P 9 H8 Z' D7 \9 P谢谢指教。